Construction Diving Repair Dry Dock' Gate Dung Quat 10-2015

Object: Pontoon gate.
Dimension: 87.5m x 8.2m x 13.3m
Water-line: 7.6m
Location: Dung Quat Dry Dock.
Date: 10-2015
 
hien-trang-1.jpg hien-trang-2.jpg

Present status of Dry Dock’ gate: Scope of work:
  • Repair and replace all P-rubber-wafher, steel plates, wood. Ensure Dry Dock’s gate is closed tight.
Pictures:

gia-cong-go-1.jpg gia-cong-go-2.jpg
lap-la.jpg uc-lo-1.jpg
uc-lo-2.jpg uc-lo-3.jpg
uc-lo-4.jpg ieu-khien-CCTV.jpg
lan-thi-cong-1.jpg lan-thi-cong-2.jpg
lan-thi-cong-3.jpg lan-thi-cong-4.jpg
lan-thi-cong-5.jpg lan-thi-cong-6.jpg
lan-thi-cong-7.jpg lan-thi-cong-8.jpg
lan-thi-cong-9.jpg lan-thi-cong-10.jpg
lan-thi-cong-11.jpg lan-thi-cong-12.jpg
lan-thi-cong-13.jpg lan-thi-cong-14.jpg
lan-thi-cong-15.jpg lan-thi-cong-16.jpg
lan-thi-cong-17.jpg lan-thi-cong-18.jpg
lan-thi-cong-19.jpg lan-thi-cong-20.jpg
lan-thi-cong-21.jpg lan-thi-cong-22.jpg

Final:

final-2.jpg final-3.jpg
final-1.jpg final-4.jpg



Related articles

  • Provision of diving service to repair sea chest Vinaline Diamond 9-2015

  • Diving dredging the mud at pump-station of PV Power 10-2015

  • Supporting CS Asean Protector to repair and bury the telecommunication cable

  • Zinc anode replacement for Vinalines Diamond