Pre-installaiton survey for Su Tu Nau oil field


PMS provide the diving team, diving equipment and diving supply vessel to carry out the air diving campaign for underwater survey the seabed within the area 200mx200m around the jacket installation positions of STN-N and STN-S jacket. Pick up all small debris and marking the position of big debirs on GPS navigation and positioning.

Survey the concrete condition around the wellhead No.5 of STN-S jacket, check the verticalness of wellhead No.5, check the deflection angle between the wellhead tilt direction with the jacket North

PMS-HYUNDAI-082013_Job-Completion-Report_Air-diving-for-pre-installation-survey-STN-project_REV-B.pdf

Related articles

  • Construction Diving Repair Dry Dock' Gate Dung Quat 10-2015

  • Provision of diving service to repair sea chest Vinaline Diamond 9-2015

  • Diving dredging the mud at pump-station of PV Power 10-2015

  • Supporting CS Asean Protector to repair and bury the telecommunication cable