PMS provvide the diving team, equipment and DSV to cut and remove the trawl-net at system pipeline of Ruby field, Petronas
	
	Water depth: 55 msw
	 
	The pipeline system is covered by a trawl-net
	 
	Divers cut and remove the trawl-net
	Pull the trawl-net up to maindeck of DSV
	The pipeline system after remove trawl-net
                        
                        