Site clearance verification

PMS provides the well owners with a final verification method of abandoned wells in accordance with the site clearance regulations. The trawl method will be used to verify a clean bottom at abandoned well sites by survey divers.

Above methods have been also used for the seabed survey to find out the big debris or holes which could be affected to the Trident anchorage.

Related articles

  • Anti-Corrosion Protection Inspection And Replacement

  • Salvage

  • Underwater inspection

  • Burying the optical cable